
 |
|
Diede Construction is bidding on the following projects:
Schedule
- ATTENTION Subcontractors: To obtain access to Diede Construction's FTP site for an electronic version of bid documents (plans, specs, addenda's) of the projects listed below, email estimating@diedeconstruction.com for instructions.
PROJECTS LISTED BELOW IN ALL CAPS PAYS PREVAILING WAGE
Projects listed in Upper and Lower Case - Prevailing Wage Rates Not Required
Should you have an RFI on a project, please contact estimating@diedeconstruction.com, your request will be forwarded for reply.
SUBCONTRACTOR INVITATION TO DDC's BID SCHEDULE:
- Tuesday, May 22, 2012 at 2:00 p.m.
Lodi Unified School District - KITCHEN RENOVATIONS AT VARIOUS SITES
Addenda 2
Project Location & Description - Lodi -
Complete renovation of the kitchens at Davis and Heritage Elementary Schools.
It also includes?renovations of restrooms and ADA site features. This work includes hazardous materials removal, demolition, concrete, framing, mechanical, plumbing, electrical, architectural finiahes and food service equipment
- Tuesday, May 22, 2012 at 2:00 p.m.
Private - Coca Cola San Jose Canopy Enclosure
Addenda
Project Location & Description - San Jose - Possible sub trades needed:
Demolition, Pavement Marking, Reinforcing Steel, Concrete, Structural Steel, Stainless Steel Fabrication, Insulation, Joint Sealants, Doors, Frames & Hardware, Roll-Up Doors, Epoxy Coatings, Toilet Accessories, Metal Building system, Mechanical, Plumbing, and Electrical
- Wednesday, June 6, 2012 at 4:00 p.m.
Yosemite Community College District - MJC PRIMARY DATA CENTER PROJECT
Addenda
Project Location & Description - Modesto - Scope of work includes the construction of a new 4,554 sq. ft. Data Center on the West Campus of Modesto Junior College Campus. Work includes site excavation, grading, site utilities, parking lot, exterior lighting, restrooms, access floor, fire protection, data racks and servers, with mechanical and electrical equipment. Also included is the enclosure of an equipment yard with electrical transformer and generator serving the Data Center
- Friday, June 8, 2012 at 4:00 p.m.
Private - Sleep Train Redding Tenant Improvements
Addenda
Project Location & Description - Redding - Possible sub trades needed:
Demolition, Hard Demolition, Millwork/Moldings, Doors, Frames & Hardware, Glass/Storefront, Frame Drywall, Acoustical, Painting, Flooring-Resilient, Ceramic Tile, Plumbing, HVAC, Electrical
|
|
Copyright 2010. Diede Construction, Inc. All Rights Reserved.
Contractor's License No.'s:
CA 632667 /
NV 0042319 /
WA DIEDECI902JE /
ID RCE21300 /
HI 30496
|