• Skip to main content
Diede Construction Logo
MENU
  • Home
  • About
    • About DDC/History
    • Management Team
    • Our Philosophy
    • Safety Program
    • News
  • Bids
  • Projects
    • See All Projects
    • Hawaii
    • Hydro-X
  • Careers
  • Diede Homes
    • DDH News
    • Photo Gallery
  • Hydro-X
  • Hawaii
  • Contact

Fremont Fire Tactical Training Center

Location
Fremont, California

Architect
WLC Architects

Facility Size
8,972 Sq. Ft.

Completed
June 2009

HELPING FIREFIGHTERS PREPARE

For this project, Diede was the lowest bidder to complete this training facility that included: New site development, erect 3,746 sq ft classroom building including restroom/locker facilities and five story 5,226 sq ft CMU training tower with burn room, roof prop, apparatus bay and cantilevered concrete platforms for repel training. Site includes a trench rescue prop and confined space prop. The trench rescue prop is a recessed structure with 8’ vertical stamped concrete walls patterned to resemble crumbling earth as if the firemen were in a large excavation. The confined space prop is 150’ subsurface tunnel created with various sizes of reinforced concrete pipe that the firemen crawl through. 66,000 sq ft of concrete paving was installed to allow room for training exercises with the fire trucks and response vehicles.

fremont tactical training center
fremont tactical training center
fremont tactical training center
fremont tactical training center
Diede Construction Logo
ABC-Logo_125px

Home | Hawaii | Hydro-X | Diede Homes | Bids | Careers | Safety Program

Copyright 2025. Diede Construction, Inc / All Rights Reserved

Contractor's License No.'s: CA 632667
DIR Registration No. 1000002716

Facebook LinedIn Instagram