• Skip to main content
Diede Construction Logo
MENU
  • Home
  • About
    • About DDC/History
    • Management Team
    • Our Philosophy
    • Safety Program
    • News
  • Bids
  • Projects
    • See All Projects
    • Hawaii
    • Hydro-X
  • Careers
  • Diede Homes
    • DDH News
    • Photo Gallery
  • Hydro-X
  • Hawaii
  • Contact

Oakdale High School Aquatic Center

Location
Oakdale, California

Architect
WWCOT Architects

Facility Size
11,654 Sq. Ft.

Completed
August 2010

SERVING POOL & STADIUM

The project consisted of a 8,686 square foot pool, 14 swim lanes, a maximum depth of seven feet, it holds 433,932 gallons of water, feature a Colorado timing system with touch pads and information board, there also are two 25-yard practice areas, it can accommodate water polo and swim practice simultaneously, a beginning swim area with stairs and an ADA lift for P.E., and more.

The building serves as both the pool and stadium facilities, it house changing rooms, showers, coaches offices, an equipment room, restrooms for the pool and stadium, a stadium store, and more. There is also a state of the art sound system.

Diede Construction Logo
ABC-Logo_125px

Home | Hawaii | Hydro-X | Diede Homes | Bids | Careers | Safety Program

Copyright 2026. Diede Construction, Inc / All Rights Reserved

Contractor's License No.'s: CA 632667
DIR Registration No. 1000002716

Facebook LinedIn Instagram