Union Pacific Long Rail Welding Facility

Location
Stockton, California

Architect
J.B.S. Cranes & Accessories, Inc.

Facility Size
14,560 sq. ft.

Completed
March 2015

ONE-OF-A-KIND OPERATION

Union Pacific is the first in the rail industry to import long rail from Japan, which is delivered to its facility at the Port of Stockton. Diede Construction was selected as the design-build contractor on this multi-prime contractor project to deliver custom welding facilities. Diede designed and constructed three structures to accommodate a one-of-a-kind operation, wherein 420-foot lengths of rail are welded into units measuring 1680 feet in length. The structures included facilities for the welding and inspection operations as well as a conveyor system canopy. The uniqueness of the operation as well as the multitude of parties associated with the overall facility development presented many challenges. However, Diede proved to be an integral component of the successful completion of the Long Rail Facility as the original scope of work increased to include assisting other prime contractors with work on the rail storage structure, cranes, and extensive electrical work to bring the welding and conveyance equipment into production.

building inspection
metal structure
inside structure
weld building exterior
Diede Construction Logo
ABC-Logo_125px

Home | Hawaii | Hydro-X | Diede Homes | Bids | Careers | Safety Program

Copyright 2025. Diede Construction, Inc / All Rights Reserved

Contractor's License No.'s: CA 632667
DIR Registration No. 1000002716

Facebook LinedIn Instagram